|
|
|||||||
| End User/Client |
|
||||||
| QLD Transport/Clough Saymour Whyte JV | |||||||
| Location | |||||||
|
Brisbane, Australia |
|||||||
|
Description of works |
|||||||
| | HDPE Membrane supply | ||||||
| | Installation | ||||||
| | Termination | ||||||
| Project Period | |||||||
| 2003 | |||||||
| Project Details | |||||||
|
EPTEC supplied and installed 10,000 square metres of 2mm flat HDPE sheet as waterproof membrane to the tunnels. HDPE sheet membrane was terminated to polylock HDPE channel by extrusion welding. A bonded rubber/bitumen polyethylene membrane was applied to pre cast concrete joints. |
|
||||||
|
|||||||
| << back to case history | top | |||||||