<< Back to Case History

End User/Client
 
  Department of Commerce for the Sydney Catchment Authority
   
Location
 

Warragamba Dam

 

Description of works

Design
Scaffolding
Encapsulation
Demolition
Rail fabrication
Lead abatement
Protective Coating
Site Works
Cathodic protection
   
Project Period      
  2004 - 2005  
       
Project Details    

Warragamba Dam was commissioned in 1960 and the dam wall extended in 1991. Steel guide rails in the upstream face facilitate the installation of stoplogs allowing maintenance of the four radial gates.

The unprecedented low water levels, exposed the full height of the rails facilitating access to replace or refurbish the heavily corroded rails.

As the primary contractor, Eptec's scope was to remove the existing rails by demolition of grout, fabrication of new rails and cathodic protection to eliminate contamination of water supply all work was within the confines of a contained encapsulation area.

All work was undertaken under an accelerated program in case of increased water levels.

 
<< back to case history | top