| End User/Client |
![]() |
||||||
| Department of Commerce for the Sydney Catchment Authority | |||||||
| Location | |||||||
|
Warragamba Dam |
|||||||
|
Description of works |
|||||||
| | Design | ||||||
| | Scaffolding | ||||||
| | Encapsulation | ||||||
| | Demolition | ||||||
| | Rail fabrication | ||||||
| | Lead abatement | ||||||
| | Protective Coating | ||||||
| | Site Works | ||||||
| | Cathodic protection | ||||||
| Project Period |
|
||||||
| 2004 - 2005 | |||||||
| Project Details | |||||||
|
Warragamba Dam was commissioned in 1960 and the dam wall extended in 1991. Steel guide rails in the upstream face facilitate the installation of stoplogs allowing maintenance of the four radial gates.
As the primary contractor, Eptec's scope was to remove the existing rails by demolition of grout, fabrication of new rails and cathodic protection to eliminate contamination of water supply all work was within the confines of a contained encapsulation area. All work was undertaken under an accelerated program in case of increased water levels. |
![]() |
||||||
| << back to case history | top | |||||||