| End User/Client | ![]() |
||||||
| Royal Australian Navy/Tenix Defence Systems | |||||||
| Location | |||||||
|
Melbourne, Australia |
|||||||
|
Description of works |
|||||||
| | Design of platform | ||||||
| | Integration with ship specification | ||||||
| | Fabrication and supply of FRP platform | ||||||
| | Trial installation | ||||||
| | Integrated logistics specification | ||||||
| Project Period | |||||||
| 2002 | |||||||
|
|
|||||||
| Project Details | |||||||
|
Design was conducted in liaison with the Client, producing a functional and feasible platform that conformed to minimum weight and highest impact resistance requirements. The platforms were supplied on schedule with all of the integrated logistics
support. |
|||||||