| End User/Client | ![]() |
||||||
| Western Mining Corporation | |||||||
| Location | |||||||
|
Olympic Dam, Australia |
|||||||
|
Description of works |
|||||||
| | Spooling of joints | ||||||
| | Shop Manufacture | ||||||
| | FRP pipe & fitting fabrication and supply | ||||||
| | Quality assurance procedure | ||||||
| | Conductive pipework | ||||||
| | Pipe testing | ||||||
| Project Period | |||||||
| 2002 - 2003 | |||||||
|
|
|||||||
| Project Details | |||||||
|
Also involved in the project, is the provision for attachment of fittings and pipes to lengths of piping. This pre-spooling reduced the amount of on-site fabrication required. The requirement for conductive pipework provided additional challenges in excess of standard quality controls. The integrity of conductivity has been ensured with skilled workmanship and testing. On time delivery was provided through EPTEC's project management of quality
and programming. |
|||||||