| End User/Client | ![]() |
||||||
| JHP/Richard Crooks | |||||||
| Location | |||||||
|
Sydney, Australia |
|||||||
|
Description of works |
|||||||
| | Carbon-fibre reinforcement | ||||||
| | Application of protection screed | ||||||
| | Slab-rectification-crack repair | ||||||
| | Render removal | ||||||
| Project Period | |||||||
| 2002 | |||||||
| Project Details | |||||||
|
EPTEC worked closely with the structural engineer, its knowledge of materials
and experience allowed the design to be completed with consideration for
the poor quality substrate. EPTEC was able to present the Client with
a solution to their structural and durability requirements. |
|||||||
|
|
|||||||