<< Back to Case History

End User/Client
 
  Sydney Water/NIAL
   
Location
 

Sydney, Australia

 

Description of works

Small diameter pipeline rehabilitation
Joint and flood grouting
Line replacement
Hydrostatic testing
CCTV inspection and cleaning
   
Project Period  
  April 1999 - Dec 1999    
       
Project Details    

Sewer rehabilitation was completed in four catchments for Sydney Water. The works included inspection of mainlines and house service lines to identify required rehabilitation works. The location and nature of the works required extensive communication with residents in accordance with Sydney Water protocols.

The seaside location of the work presented its own unique difficulties for access and repair methods. Deep manholes and highly permeable soils required special planning and rehabilitation techniques.
 

 
<< back to case history | top