| End User/Client | ![]() |
||||||
| Sydney Water/NIAL | |||||||
| Location | |||||||
|
Sydney, Australia |
|||||||
|
Description of works |
|||||||
| | Small diameter pipeline rehabilitation | ||||||
| | Joint and flood grouting | ||||||
| | Line replacement | ||||||
| | Hydrostatic testing | ||||||
| | CCTV inspection and cleaning | ||||||
| Project Period | |||||||
| April 1999 - Dec 1999 | |||||||
| Project Details | |||||||
|
The seaside location of the work presented its own unique difficulties
for access and repair methods. Deep manholes and highly permeable soils
required special planning and rehabilitation techniques. |
![]() |
||||||
| << back to case history | top | |||||||