| End User/Client | ![]() |
||||||
| Department of Defence / SKM | |||||||
| Location | |||||||
|
RAAF Base Williamtown, NSW |
|||||||
|
Description of works |
|||||||
| | Saw-Cutting of Concrete Blast Pads | ||||||
| | Concreting | ||||||
| | Concrete Joints Repair | ||||||
| | Coring & Excavation | ||||||
| | Surface Preparation & Line Marking | ||||||
| | Installation of Aircraft Tie-Down Points | ||||||
| | Foreign Object Damage (FOD) Management | ||||||
| Project Period | |||||||
| July 2006 | |||||||
| Project Details | |||||||
|
The project consisted of the following aspects;
Special features of the project were Eptec's development of special tie-down keys and the management of foreign objects within the work vicinity, which would otherwise pose a serious hazard to aircraft. As the work was undertaken on access restricted Department of Defence site, stringent controls were adopted by Eptec throughout all phases of the project. |
![]() |
||||||