End User/Client
 
  Department of Defence / Defence Maintenance Management (DMM)
   
Location
 

HMAS Watson, Eastern Sydney, NSW

 

Description of works

Construction of a 600,000 L Reinforced Concrete Tank
Shotcreting
Excavation (800m3)of Asbestos Contaminated Soil
Laying of 500m of Reinforced Concrete Pipes averaging 500mm in diameter
Rainwater Tanks Installations
Traffic Control Management
Waterproofing
Site Restoration Works -Returfing & Landscaping
Site Security - Fencing & CCTV Camera
   
Project Period      
  2007  
       
Project Details    

Eptec was awarded a contract to make the Naval Base more efficient in the management of stormwater in accordance with environmental requirements. The strategy included the construction of a reinforced concrete retention tank, excavation and pipe laying, installation of rainwater tanks and water restriction devices across the Base including the installation of water restriction toilets fitting to 200 toilets / bathrooms.

Other integral aspects of the project included the reconditioning of Wilson Field, laying of asphalt road / car park, traffic control management, internal / external waterproofing as well as site restoration works such as returfing, landscaping and fencing.


 

 