End User/Client
 
  RailCorp NSW
   
Location
  Western Sydney, Australia
 

Description of works

Lead Paint Management
Surface Preparation - High Pressure Waterwash & Powertool Cleaning
Protective Coating Application
Scaffolding & Encapsulation    
Permanent Walkway Scaffold  
Wash Water Recycling  
'Live Track' Environment  
 

Project Period    
  2005 - 2006  
     
Project Details  

The Nepean Bridge is a twin track, through truss, transom top bridge constructed from riveted steel sections and spans across the Nepean River in Penrith. The project covered the spot removal of existing red lead based paint and the application of a multi-coat paint system to the five spans of the bridge (272m).

Integral aspects of the project are as follows;

  • Installation of permanent walkway scaffold so as not to disrupt track movement
  • Staged scaffolding to allow access to workface
  • High pressure water wash & localised power tool cleaning of bridge steel work
  • Recycling of Wastewater.
  • Lead Paint Management
  • Encapsulation
  • Working under "Live Track" Environment

  •  