End User/Client
 
  TT Line Company Pty Ltd
   
Location
  Sydney, Devonport (Tasmania) & Melbourne
 

Description of works

Refurbishment of deck 9, both ships concurrently
Surface preparation to client specifications
Work off elevated platforms
Complete external hull coating (AWL) to both vessels    
Superstructure and bridge surfaces coating to both vessels  
 

Project Period    
  2003, 2004, 2006, 2007 & 2009  
     
Project Details  

Spirit of Tasmania I & II Deck 9 Refurbishment
TT Line operates two ferries that transport passengers and cargo to Tasmania on a daily basis from Melbourne.

Eptec refurbished deck 9 floor coverings, carpet, tiles, and seating. Works were completed while the vessels were operational, mooring in the morning and being ready for departure each evening, without disruption to the ship's passage.

Spirit of Tasmania I & II External Refurbishment
The above-waterline areas of hull, superstructure, bridge and funnels were pressure water cleaned, corroded areas power tool cleaned, primed and fully coated with polyurethane coating. Markings and signage were reproduced.

The under water hull has been spot abrasive blasted, primed and re-antifouled.

Work was undertaken whilst the vessels were dry docked for survey under strict time restrictions. Access to all work faces was achieved by strategic positioning and innovative use of elevated work platforms in the safest environment.


 