| End User/Client | ![]() |
||||||
| Baulderstone-Hornibrook Pty Ltd | |||||||
| Location | |||||||
| Sydney, Australia | |||||||
|
Description of works |
|||||||
| | High pressure water wash | ||||||
| | Epoxy based maintenance coating application | ||||||
| | Working in a high wind environment | ||||||
| Project Period | |||||||
| Feb-March 2003 | |||||||
| Project Details | |||||||
|
The scope of works included cleaning and preparing the surface in readiness for protective coating application. A containment system was set to collect the water generated by the cleaning process. The protective coating system was applied by brush and roller with the application of multiple coats in order to achieve the required thickness. Carefull planing was required due to the limited access to bring the equipment up to the structure which included carrying equipment and materials by hand.
All works were warranted. EPTEC provided the client a quality product
that is guaranteed to the client's expectations. |
|||||||
![]() |
|||||||
| << back to case history | top | |||||||