| End User/Client | ![]() |
||||||
| RIO Tinto/Select Civil | |||||||
| Location | |||||||
|
Wollongong, Australia |
|||||||
|
Description of works |
|||||||
| | Reinforcement cleaning and replacement | ||||||
| | High pressure water blasting | ||||||
| | Priming and coating concrete | ||||||
| | Confined space procedures | ||||||
| | Flow management | ||||||
| Project Period | |||||||
| 2002 | |||||||
![]() |
|||||||
| Project Details | |||||||
|
EPTEC were awarded the work following development of repair solutions that met the Clients requirements. Costs and time for the project were minimised by selecting lightweight epoxy coatings combined with a corrosion protection system. Safety management was a key consideration due to the potential for high flows in the culvert. EPTEC managed flow diversions and the confined space activities to provide a safe work environment. |
|||||||